One page for the visit. In your order of work.
Check in, deal with parts and time, sign off with photos, and read the site's documents — on one page, with the chat beside it.
Step by step
What happens on a visit
"I'm on my way"
One tap tells the company you've set off, and you confirm when you expect to arrive. Nobody waits at a locked door.
Check in
Check in when you arrive and tick the company's arrival items. Your check-in time is what the bill and your pay are worked out from.
More time
A visit is planned as one hour. You're asked 15 minutes before it ends whether you need more, and the company approves or declines.
Couldn't resolve it
If the job can't be finished on this visit, say why. A second visit opens, and who pays depends on the reason.
Sign-off with photos
Tick each of the company's sign-off items, or mark one "Can't complete this" with the reason and what happened.
Chat, not phone tag
Message the company on the job, with files. Your number is never shown to them.
The sign-off
Item by item, with the reason
The company sets the items; you answer each one. Anything you couldn't complete goes to them with your reason, not into a note nobody reads.
- Reasons on the company's side: no access, a part missing, the site not ready
- The company approves, or sends it back inside 30 minutes
- After that window you can leave the site
Questions
Things firms ask
Who can see what a job pays?
Your firm's owner and office. A technician sees their own jobs and never any money.
What if I'm running late?
Give your expected arrival; a time after arrive-by is allowed and the company is told. A check-in more than 15 minutes late can lead to a fee, which your firm can explain first.
Can someone else take over my visit?
Yes. A check-in belongs to the technician who made it, so whoever takes over checks in themselves.
Ready to take work?
Sign up, upload three documents, and set your areas and trades.